Boeing Begins Final Assembly of 1st P-8A Poseidon

Written on April 3, 2008 – 10:06 pm | by Frontier India Strategic and Defence |

Boeing on Monday began final assembly of the first P-8A Poseidon for the U.S. Navy. The P-8A will provide increased capability in long-range anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance.

The start of final assembly follows closely on the heels of Spirit AeroSystems’ delivery of the first P-8A fuselage to Boeing in Renton, Wash. Mechanics loaded the fuselage into a tooling fixture and began installing systems, wires, tubing and other small parts. Boeing will join the P-8A’s wings to its body later this year.

P-8A is a military derivative of the 737-800. The P-8A is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems and GE Aviation. Under the current System Development and Demonstration contract, the team will build five test vehicles: three flight-test and two ground-test aircraft. Delivery of the first test aircraft to the Navy and first flight are scheduled for 2009.

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013.

You must be logged in to post a comment.

© 2007-2008 Frontier India Strategic and Defence - News, Analysis, Opinion. Powered by Frontier India Technology